1. Abouelela, M., Benedicenti, L., 2010. Bayesian network based XP process modelling. International Journal of Software Engineering & Applications 1 (3), 1-15. DOI: 10.5121/ijsea.2010.1301
2. Acebes, F., Pereda, M., Poza, D., Pajares, J., Galán, J.M., 2015. Stochastic earned value analysis using Monte Carlo simulation and statistical learning techniques. International Journal of Project Management 33 (7), 1597-1609. DOI: 10.1016/j.ijproman.2015.06.012 EDN: XOVBKP
3. Aronson, E., Gerard, E., 1966. Beyond Parkinson’s Law: the effect of excess time on subsequent performance. Journal of Personality and Social Psychology 3 (3), 336-339. DOI: 10.1037/h0023000
4. Barrientos-Orellana, A., Ballesteros-Pérez, P., Mora-Melia, D., González-Cruz, M.C., Vanhoucke, M., 2021. Stability and accuracy of deterministic project duration forecasting methods in earned value management. Engineering, Construction and Architectural Management 29 (3). DOI: 10.1108/ECAM-12-2020-1045 EDN: LHKHKC
5. Dubois, D., Fargier, H. Fortemps, P., 2003. Fuzzy scheduling: modelling flexible constraints vs. coping with incomplete knowledge. European Journal of Operational Research 147 (2), 231-252. DOI: 10.1016/S0377-2217(02)00558-1
6. Escandon-Bailon, V., Cervantes, H., García-Nájera, A., Zapotecas-Martínez. S., 2021. Analysis of the multi-objective release plan rescheduling problem. Knowledge-Based Systems 220, 106922. DOI: 10.1016/j.knosys.2021.106922 EDN: AHUATO
7. García, C.B.G., Pérez, J.G., Rambaud, S.C., 2010. Proposal of a new distribution in PERT methodology. Annals of Operations Research 181 (1), 515-538. DOI: 10.1007/s10479-010-0783-1 EDN: ZCAAGY
8. Gładysz, B., 2017. Fuzzy-Probabilistic PERT. Annals of Operations Research 258 (2), 437-452. DOI: 10.1007/s10479-016-2315-0 EDN: FMEMEL
9. Goldratt, E.M., 2017. Critical Chain: A Business Novel. Routledge.
10. Hamouda, A.E.D., 2014. Using Agile story points as an estimation technique in CMMI organizations. In: 2014 Agile Conference, 16-23. Kissimmee, FL, USA: IEEE. DOI: 10.1109/AGILE.2014.11
11. Inayat, I., Salim, S.S., Marczak, S., Daneva, M., Shamshirband, S., 2015. A systematic literature review on agile requirements engineering practices and challenges. Computers in Human Behavior 51, 915-929. DOI: 10.1016/j.chb.2014.10.046
12. Islam, M.S., Mohandes, S.R., Mahdiyar, A., Fallahpour, A., Olanipekun, A.O., 2022. A coupled genetic programming Monte Carlo simulation-based model for cost overrun prediction of thermal power plant projects. Journal of Construction Engineering and Management 148 (8), 04022073. DOI: 10.1061/(ASCE)CO.1943-7862.0002327
13. Kelley, J.E., Walker, M.R., 1959. Critical-path planning and scheduling. In: Papers Presented at the December 1-3, 1959, Eastern Joint IRE-AIEE-ACM Computer Conference on IRE-AIEE-ACM ’59 (Eastern), 160-73. Boston, Massachusetts: ACM Press, 1959. DOI: 10.1145/1460299.1460318
14. Kisielnicki, J., Misiak, A.M., 2017. Effectiveness of Agile compared to Waterfall implementation methods in IT projects: analysis based on business intelligence projects. Foundations of Management 9 (1), 273-286. DOI: 10.1515/fman-2017-0021
15. Korytkowski, P., Malachowski, B., 2019. Competence-based estimation of activity duration in IT projects. European Journal of Operational Research 275 (2), 708-720. DOI: 10.1016/j.ejor.2018.11.061
16. Leach, L.P., 1999. Critical chain project management improves project performance. Project Management Journal 30 (2), 39-51. DOI: 10.1177/875697289903000207
17. Levenberg, K., 1944. A method for the solution of certain non-linear problems in least squares. Quarterly of Applied Mathematics 2 (2), 164-168. DOI: 10.1090/qam/10666
18. Mahmoodzadeh, A., Nejati, H.R., Mohammadi, M., 2022. Optimized machine learning modelling for predicting the construction cost and duration of tunnelling projects. Automation in Construction 139, 104305. DOI: 10.1016/j.autcon.2022.104305 EDN: UTCHOI
19. Miranda, P., Faria, J.P., Correia, F.F., Fares, A., Graça, R., Moreira, J.M., 2021. An analysis of Monte Carlo simulations for forecasting software projects. In: Proceedings of the 36th Annual ACM Symposium on Applied Computing, 1550-58. Virtual Event Republic of Korea: ACM, 2021. DOI: 10.1145/3412841.3442030
20. Moreira, M.E., 2013. Being Agile: Your Roadmap to Successful Adoption of Agile. Apress.
21. Morgenshtern, O., Raz, T., Dvir, D., 2007. Factors affecting duration and effort estimation errors in software development projects. Information and Software Technology 49 (8), 827-837. DOI: 10.1016/j.infsof.2006.09.006
22. Paasivaara, M., Behm, B., Lassenius, C., Hallikainen, M., 2018. Large-scale agile transformation at Ericsson: a case study. Empirical Software Engineering 23 (5), 2550-2596. DOI: 10.1007/s10664-017-9555-8 EDN: YEIDML